Meriton Liverpool

Project Overview
Meriton Liverpool is a 32-story high-rise apartment development requiring the installation of 751 precast panels. Situated in the heart of Liverpool, this project presented unique challenges due to its location on a narrow, one-way street. Prestige Precast was responsible for ensuring the seamless and precise installation of these panels, overcoming logistical constraints while maintaining high safety and quality standards.
Scope of Work
Prestige Precast played a key role in delivering a structurally sound and aesthetically refined building. The scope of work included:
- Installing 751 precast panels across 32 floors
- Managing crane operations and material deliveries in a narrow one-way street
- Ensuring proper alignment and secure fastening of all panels
- Coordinating with contractors to optimize workflow and maintain project timelines
Challenges and Solutions
Operating in a restricted urban environment
With the site located on a narrow one-way street, space for crane positioning and material deliveries was extremely limited. The team developed a phased delivery plan, carefully scheduling panel installations to ensure minimal disruption to surrounding businesses and traffic.
Handling large-scale precast panels
Some of the panels were large, requiring precise lifting and positioning to fit seamlessly within the building’s structure. Advanced lifting equipment and alignment techniques were used to ensure secure placement while maintaining the architectural integrity of the design.
Meeting tight project deadlines
As with any high-rise development, staying on schedule was critical. Close collaboration with site managers and other contractors ensured that installation phases were completed on time without affecting other construction activities.
Results and Impact
The successful completion of the Meriton Liverpool project demonstrated Prestige Precast’s ability to execute high-rise developments with efficiency and precision. The key outcomes included:
- Flawless installation of 751 precast panels across 32 stories
- Effective logistical planning to overcome urban site constraints
- Secure and durable precast elements ensuring long-term structural integrity
- On-time completion while maintaining the highest safety standards

Committed to Quality, Built for Success
Industry Expertise
Safety First
Timely Execution
Tailored Solutions
Frequently Asked Questions
The project site was in a narrow, one-way street, which required precise planning for crane operations, material deliveries, and overall site coordination.
We implemented a phased delivery and installation approach, ensuring that every stage was carefully coordinated to maximize efficiency and minimize disruption.
Advanced lifting and positioning techniques, combined with laser-guided measurements, were used to ensure each panel was installed securely and with precision.
Strict safety protocols were followed, including secure lifting procedures, structural integrity checks, and continuous communication with site managers.
This high-rise development reinforced our ability to handle large-scale urban projects, showcasing our expertise in delivering high-quality precast solutions in challenging environments.